The complete kit includes one-piece computer CNC cut 3mm thick heavy-duty vacuum support bracket made with unpainted/raw stainless steel with screws and a set of extension use wiring
Move the brake booster air/vacuum pump initially located inside the driver side frame rail right behind the bumper to the side into the engine bay
This re-location setup will give you the necessary room to install an aftermarket front bumper or add a winch for your Wrangler
Since this product is cut out from a piece of stainless steel sheet, there are some CNC cutting/production marks and they are completely normal